Feedback
I.D.: 107606093

Paddling Pool Re-surfacing

Vrsta ugovora
Public Works Contract
Datum objave
02/01/25
Vrsta objave:
Awarded Contract
CPV kodovi
92330000
Mjesto isporuke:
Hampshire CC
  • Preuzmi
  • Printanje
  • Bilješke
    Morate biti prijavljeni kako biste mogli spremiti bilješke.
  • Proslijedi
  • Prijevod
Opis:
Hedge End Town Council are looking to resurface the paddling pool ahead of the 2023 season which begins in May. The existing facility is extremely popular, so it is crucial that these works are completed ahead of the May opening. Site Description The paddling pool was originally installed by Sunsafe in 2001 and has been resurfaced twice since in 2007 and 2014. The pool is located on the southern end of St. Johns Recreatio...
Hedge End Town Council are looking to resurface the paddling pool ahead of the 2023 season which begins in May. The existing facility is extremely popular, so it is crucial that these works are completed ahead of the May opening. Site Description The paddling pool was originally installed by Sunsafe in 2001 and has been resurfaced twice since in 2007 and 2014. The pool is located on the southern end of St. Johns Recreation Ground. Access is through a gate on the northern boundary leading directly from a tarmac car park. There is no formal road to the site, but the field can be safely traversed during late spring/ summer providing it has not been too wet. The existing pool wetpour surfacing is approximately 300m2 in total, including the areas below the water level, the area above water level and the area directly outside the main pool that edges the perimeter drains. Tender brief Provide options and prices to resurface the paddling pool wetpour surfacing. Quotes must include removal and disposal of the existing surface. Option 1 - To remove existing surfacing (Areas A, B & C on map above) and to supply and lay a total of (approximately) 300m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will consist of 3 'splash' shapes around the water features, a splash shape within the pool itself and a change in colour between the area in the water and the shoreline (Beach) in a mix of 3 colours - yellow, aquamarine blue and a dark blue. Option 2 - To remove existing surfacing in areas 'A' and 'B' and to supply and lay a total of (approximately) 225m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will consist of 3 'splash' shapes around the water features, a splash shape within the pool itself and a change in colour between the area in the water and the shoreline (Beach) in a mix of 3 colours yellow, aquamarine blue and a dark blue. In addition, area 'C' requires repair at the join between the wetpour and the drains which is approximately 45m in length. Option 3 - To remove existing surfacing in the blue (A) area only and to supply and lay a total of (approximately) 125m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will be similar to the existing in aquamarine blue and a dark blue 'splash' shape in the centre of the pool. In addition, area 'C' requires repair were the wetpour joins the drains which is approximately 45m in length. Additional - We would be interested to see example designs, motifs etc of previous projects as well as an indication of costs that could add interest to the site. Prices All prices are to be net, excluding VAT.
Registrirajte se sada za 7-dnevni besplatni test i omogućite si pristup ovom i mnogim drugim tenderima iz Vaše branše!

Zašto tenderi.hr?

  • Individualizirane pretrage

  • Najopširnija baza tendera u Hrvatskoj

  • Osobni agent za korisničku podršku -
    čak i za vrijeme besplatnog testiranja!

  • Dnevna dostava novih tendera

Moja registracija