Feedback
I.D.: 106287186

The updating of the aps, apd and dao studies for the protection of the village of bonkoirey zéno and the construction of a saga fondo crossing work respectively in the communes of namaro

Vrsta ugovora
Service Contract
Datum objave
29/11/24
Vrsta objave:
Awarded Contract
 
 
Mjesto isporuke:
  • Preuzmi
  • Printanje
  • Bilješke
    Morate biti prijavljeni kako biste mogli spremiti bilješke.
  • Proslijedi
  • Prijevod
Opis:
P175857-Niger Integrated Urban Development and Multi-sectoral Resilience Project
Registrirajte se sada za 7-dnevni besplatni test i omogućite si pristup ovom i mnogim drugim tenderima iz Vaše branše!

Zašto tenderi.hr?

  • Individualizirane pretrage

  • Najopširnija baza tendera u Hrvatskoj

  • Osobni agent za korisničku podršku -
    čak i za vrijeme besplatnog testiranja!

  • Dnevna dostava novih tendera

Moja registracija

Pogledajte slične tendere

Naslov Rok
Environmental and social impact notice (nies) of the project to protect the village of bonkoirey zéno and to create a crossing in the communes of namaro and bitinkodji  
Updating technical studies aps, apd and dao for the development of koris d'agzermaden urban commune of agadez  
Updating of the aps, apd and dao technical studies for the development of the babayé pond and the protection of the banks of kori maboya amaré in the town of tahoua, the protection of the banks of koris and  
Aps, apd and dao studies including monitoring and control for the construction of drainage works in the reconstruction component of the communes of diffa, zinder, tessaoua and maradi  
Updating of aps, apd and dao technical studies and control of ravine treatment works in mazadou djika, zaria, and bourja  
Technical studies apd) and dao for the work to upgrade the dike system and the development of a sustainable solution to reduce the risk of flooding in the city of niamey  
Environmental and social impact notice (nies) of the koris development work and the crossing work respectively in bado and toumboul in the commune of illéla in the tahoua region  
Updating the environmental and social impact study (esia) and the resettlement action plan (par) for the construction work of the protection dike for the city of diffa  
Environmental and social impact study of the construction works of 50 km of collectors and draining roads in the 5 municipal districts of the city of niamey  
Replanning and linking to the pdes of the pdcs of the communes of diffa